BIM coordination for tenders that require BIM

More and more public and private tenders require BIM. Winning the tender is the first step; delivering what it asks for without stopping the works is what defines the outcome.

We work on the contractor’s side: we prepare the BIM Execution Plan, bring the designers into a single model and answer the inspection with the documents the contract requires.

What we do

From the bid to the as-built model

01

Before the bid

Knowing what you commit to and what it costs to deliver.

  • Reading the tender’s BIM requirements
  • Review of the tender documents
  • BIM Execution Plan for the bid
02

During construction documents

A federated model that meets the contract.

  • Architecture, structure and MEP modelling
  • Coordination between disciplines and clashes
  • Construction documents extracted from the model
03

During construction

The works and the model move forward together.

  • RFIs and traceability
  • Responses to inspection comments
  • As-built and operation model
Experience

Public works coordinated in BIM, under construction

LOD 350

A tender that required BIM and works already under way: we modelled the existing and the new building without stopping construction.

New Santa Fe Judiciary Archive

See the case →

+130

technical communications traced between site, inspection and specialists.

Santa Fe Sur Police Station · COCYAR · under construction

See the case →

ISO 19650

Execution plans, deliverables and information levels under the criteria tenders ask for.

Bertone & Nieva

Bidding on a tender that requires BIM?

Tell us what the tender asks for and what stage you are at. We can join before the bid or once the works are awarded.

Ask on WhatsAppWrite to us
Frequently asked questions

What contractors ask us

Does my company need to have BIM?

No. We can take on the whole BIM side of the contract and work with your technical office. If you want to adopt it, we leave you your own standards and training.

Can you join once construction has started?

Yes. That is what we did on the Judiciary Archive: we joined with the works under way and brought the model up to date without stopping construction.

How is coordination charged?

With its own scope and price, separate from the works, so the contractor knows from the start what it is paying for and what it gets.

Tender review before bidding → · All services →