A clash solved in the model costs an afternoon of coordination. The same clash on site costs demolition, rework and a delayed schedule. Our job is to find it first.
We work as an extension of the technical office of those who design, build and operate buildings: we bring architecture, structure and MEP into a single model, coordinate the design consultants and follow the works through to the as-built model.
technical queries in six weeks and 6 inconsistencies resolved before the precast panels were manufactured, none of them visible in the 2D tender drawings.
PB Leiner industrial building · Constructora Pilatti · under constructiontechnical communications logged and traced between site, inspection, specialists and our studio. Every comment goes back into the model, the drawings and the quantities.
Santa Fe Sur Police Station · COCYAR · under constructiona new building inside an existing one, modelled on the laser scan, with a model for operation and maintenance.
New Santa Fe Judiciary Archive · UTE PECAM–MUNDOThe model and construction documents for the whole building, based on the design and on each discipline.
Whatever does not fit between disciplines, resolved before it reaches the site.
The model follows the works: every change goes back into the drawings and quantities.
Problems in drawings and specifications, known before bidding or starting.
A model that stays useful once the building is in use.
A method of its own for the company, so it does not depend on the consultant.
We review the documents, the specifications and the status of the design or the works.
We define what is modelled, at what level of detail, who checks it and how each query flows.
We integrate every discipline and close clashes before they reach the site.
Every change goes back into the model, the drawings and the quantities.
We deliver the updated model, ready for building maintenance.
We review the documents and tell you what does not fit between drawings, specifications and disciplines before you sign. A prioritised report, within a few days.
You have won a tender that requires BIM, or you have works under way with documents that do not fit. We coordinate, document and support the works.
You control cost and schedule before you start: quantities from the model and clashes resolved before tendering.
You add construction-document capacity and your own BIM standards without hiring permanent staff.
Tender documents with BIM requirements under ISO 19650 and technical review of what each contractor delivers.
An as-built model with equipment and materials information, useful for maintenance.
When the design is ours, we develop it in BIM from the first sketch and see it through to handover: design, permits and site supervision for corporate, industrial, institutional and multi-family buildings.
See architecture →ISO 19650 · PMBOK · openBIM / IFC · BCF
International Master in BIM Management · teaching at FADU UNL and on the BIM Diploma at FAUD UNSJ · coordination of the BIMday conference, CAUPSF District 1
No. We work with whatever documents you have, in 2D or as models, and deliver in PDF, IFC and a navigable 3D viewer, formats that open without licences. If you want to adopt BIM, we leave you your own standards and training.
Yes. We coordinate models from any software through IFC and BCF, the industry’s open formats.
Yes. On the Judiciary Archive we joined with construction already under way: we modelled the existing and the new building without stopping the works.
Construction documents, quantities, coordination reports and, if commissioned, the as-built model ready for operation and maintenance.
Tell us what stage the project or the works are at and we will reply with a scope and a timeframe.